image

Update 22nd August – Fire in the hole

Here we go again!

The hospital had collected two days worth of trash and this morning it was time to fire it up!

Or so we thought. there was a water guard to be installed on the chimney to prevent the rain hitting the second support plate. Ok, no problem we will just wait for a bit, collect all the trash.

Or so we thought. The things, since done by two rather moderate craftsmen took some time. We decided to go to the next city to buy some wood( for building a small shelf and a wall for posting instruction material). Shouldn’t take long, the place is like 20 minutes away.

Or so we thought. The bank did not open till 1 pm and change was harder to get than a popsicle in winter. THe welding took till 2.30 pm. And we started a 4 pm with the fire after preparations and stuff.

All went well tough. We burned for only two hours but got teperatures of ~800° and we burned more infectious waste than we tought we could!

today was a good day